Fuel Tank Initial Installation Complete

Today, June 6,2015, I was able to get the first fuel tank installed but not riveted in place, on the left wing. This is a major milestone because when I get the Right wing tank installed to this point, I can move the wings to the hangar and free up some much needed space in the shop.
This is after the tanks were finished, except for the leak test.


And here is the first tank installation completed as far as it can go at this stage of the project.