Fuel Tank Initial Installation Complete

Today, June 6,2015, I was able to get the first fuel tank installed but not riveted in place, on the left wing. This is a major milestone because when I get the Right wing tank installed to this point, I can move the wings to the hangar and free up some much needed space in the shop.
20150526_FuelTanksAndMe_02
This is after the tanks were finished, except for the leak test.

20150606_FT_Installation_12

And here is the first tank installation completed as far as it can go at this stage of the project.